impact:

egenco.mw

The Electricity Generation Company Malawi Limited (Egenco) is a parastatal company whose primary purpose is to generate electric power for use in Malawi and for possible sale to neighboring countries. As of April 2018, Egenco's generation capacity was 351 megawatts (471,000 hp). In May 2021, Egenco's generation portfolio increased to 441.55 megawatts (592,130 hp), when the 19 MW Tedzani IV Hydroelectric Power Station, was brought online. The headquarters of Egenco are in Chayamba Building, at 7 Victoria Avenue, in the city of Blantyre, the financial capital and largest city in Malawi. The geographical coordinates of Egenco headquarters are: 15°47'13.0"S, 35°00'20.0"E (Latitude:-15.786944; Longitude:35.005556). More information...

According to PR-model, egenco.mw is ranked 1,140,690th in multilingual Wikipedia, in particular this website is ranked 643,134th in English Wikipedia.

The website is placed before manrs.org and after archivioadisu.it in the BestRef global ranking of the most important sources of Wikipedia.

#Language
PR-model F-model AR-model
1,140,690th place
338,497th place
792,682nd place
643,134th place
156,537th place
656,056th place
frFrench
504,177th place
186,336th place
393,110th place
88,294th place
55,153rd place
34,286th place
195,229th place
121,147th place
123,974th place