impact:

terzovalico.it

The Tortona–Genoa high-speed railway, also known as Third Pass (Italian: Terzo Valico), will be a railway in Italy designed for high-speed, high-capacity services linking Genoa to Tortona around 50 km to the north. The railway will form part of the Rhine–Alpine corridor within the Trans-European Transport Networks project. Construction work started during 2013. The railway is expected to be completed by 2025. The line will be 53 kilometres (33 mi) long, 36 kilometres (22.4 mi) of which being tunnels. In addition to the line itself, a further 25 kilometres (16 mi) of branches connecting the railway to various existing lines are also planned. The estimated cost for construction of the railway is €6.2 billion. More information...

According to PR-model, terzovalico.it is ranked 367,617th in multilingual Wikipedia, in particular this website is ranked 32,383rd in Italian Wikipedia.

The website is placed before eijipress.co.jp and after asianews.eu in the BestRef global ranking of the most important sources of Wikipedia.

#Language
PR-model F-model AR-model
367,617th place
361,482nd place
421,056th place
32,383rd place
47,414th place
60,325th place
deGerman
73,598th place
609,437th place
316,623rd place
692,133rd place
453,572nd place
902,231st place
frFrench
129,147th place
100,831st place
107,333rd place
88,716th place
35,373rd place
75,289th place