"3.0". Description of Existing Facilities and Operations,the Proposed Project, and Alternatives. May 2007. p. 3.2–1. Retrieved 2010-09-20. {{cite book}}: |work= ignored (help)[dead link]
Federal Energy Regulatory Commission (2007-05-18). "Section 2: Proposed Action and Alternatives". Federal Energy Regulatory Commission Final Environmental Impact Statement for the Oroville Facilities Project (Report). p. 17. P-2100-052. Retrieved 2022-05-30. NOTE: Pumpback returns Feather River water back to Lake Oroville during off-peak periods when California Edison Company external power is inexpensive, allowing subsequent hydroelectric generation (6-7% of Hyatt total) during peak (higher price) periods.
"Feather River Fish Hatchery". 21st Annual Oroville Salmon Festival – Sept. 26. Feather River Nature Center Dinner & Dance is Friday Sept. 25. Retrieved 2016-05-15.
"California Drought Information". U.S. Geological Survey California Water Science Center. U.S. Department of the Interior | U.S. Geological Survey. February 16, 2017. Retrieved February 20, 2017.
"Oroville Dam" (Map). wikimapia.org. 2022-05-30. Retrieved 2022-05-30. NOTE: The Wikimapia path line from the spillway's confluence with the Feather River/Thermalito Diversion Pool to the Thermalito Diversion Dam defines 12 line segments of the river channel.