İzmir Metro (Turkish: İzmir Metrosu) is a light metro system in İzmir, Turkey that is in the process of being extended with new stations being put in service. The current system, consisting of one line, starts from Fahrettin Altay station in the southwestern portion of the metropolitan area and runs towards northeast to end at Evka-3 in Bornova. İzmir's metro line is 20.1-kilometre (12.5 mi) long, and serves 17 stations as of 26 July 2014. By 1990, it was thought that the existing public transport system in Izmir could no longer support the growing population. A plan was thought of to build a rapid transit network by rail to cope with this. A contract was signed in 1993, and the handover was in 1994. Construction had begun in 1995 and it was completed successfully in around 4 years. In May 2000, the system came into public service. Up to that moment, the total cost of the system had been $US600 million. Yapı Merkezi was the main contractor for all design and civil works (tunnels, bridges, viaducts, stations, tracks, infrastructure, depots and workshops) as well as the third-rail power system. More information...
According to PR-model, izmirmetro.com.tr is ranked 124,991st in multilingual Wikipedia, in particular this website is ranked 3,596th in Turkish Wikipedia.
The website is placed before stingingfly.org and after full-stop.net in the BestRef global ranking of the most important sources of Wikipedia.