The Hellisheiði Power Station (Icelandic: Hellisheiðarvirkjun, Icelandic pronunciation: ) is the eighth-largest geothermal power station in the world and largest in Iceland. The facility is located in Hengill, southwest Iceland, 11 km (7 mi) from the Nesjavellir Geothermal Power Station. The plant has a capacity of 303 MW of electricity and 400 MWth of hot water for Reykjavik's district heating. The power station is owned and operated by ON Power, a subsidiary of Reykjavík Energy. Electricity production with two 45 MW turbines commenced in 2006. In 2007, an additional low pressure steam turbine of 33 MW was added. In 2008, two 45 MW turbines were added with steam from Skarðsmýrarfjall Mountain. The hot water plant was introduced in 2010 and the last two high pressure 45 MW turbines were added in 2011. In order to reduce hydrogen sulphide pollution in the capital area a system was added to the plant in 2014 which reinjects non-condensable gases into the ground. More information...
According to PR-model, or.is is ranked 177,848th in multilingual Wikipedia, in particular this website is ranked 147,275th in English Wikipedia.
The website is placed before pikapp.org and after impressrd.jp in the BestRef global ranking of the most important sources of Wikipedia.