Analysis of information sources in references of the Wikipedia article "Boeing 737 MAX" in English language version.
The configuration is designed to maximize lift for a wingspan restricted to the same Category C-sized gates as current 737s.
Boeing has again delayed certification timelines for its two outstanding 737 Max variants, now estimating the Federal Aviation Administration will clear the Max 7 by early 2023 and the Max 10 by early 2024.
The configuration is designed to maximize lift for a wingspan restricted to the same Category C-sized gates as current 737s.