Broadview station (English Wikipedia)

Analysis of information sources in references of the Wikipedia article "Broadview station" in English language version.

refsWebsite
Global rank English rank
1st place
1st place
low place
8,671st place
low place
low place
low place
low place
low place
low place
336th place
216th place
4,401st place
2,710th place

stevemunro.ca

  • Munro, Steve (25 June 2010). "Broadview Station Second Exit Stays Closed". Archived from the original on 4 March 2015. Retrieved 16 August 2010.
  • Munro, Steve (17 April 2020). "Streetcars Return to 505 Dundas on April 20, 2020". Steve Munro. Archived from the original on 17 April 2020. Retrieved 29 April 2020. Work at Broadview Station on the extended 504 King platform is nearly complete, and this should relieve some of the streetcar queuing on Broadview outside of the station, an important consideration once the 505 Dundas streetcars are added to the traffic there. ... The existing stop has been moved west slightly so that the back end of a Flexity is right at the fence at the end of the platform. East of the crossing to the Dundas platform, the platform has been modified so that a second car can sit on the curve but still clear of the switch at the exit. ... The new layout would not have worked with the CLRVs because they have more swing-out at curves and doorways would not align with the platform edge.

tconnect.ca

thestar.com

toronto.ca

toronto.on.ca

transit.toronto.on.ca

ttc.ca

ttc.ca

cdn.ttc.ca

  • "Subway ridership, 2023–2024" (PDF). Toronto Transit Commission. Retrieved 12 November 2024. This table shows the typical number of customer-boardings made on each subway line and the number of customers travelling to and from each station platform on a typical weekday in Sep 2023–Aug 2024.

www3.ttc.ca

web.archive.org