Analysis of information sources in references of the Wikipedia article "Burj Khalifa" in English language version.
Besix, the Belgian contractor that helped build the Burj Khalifa, said that it had won $2.7bn worth of orders in Abu Dhabi.
Medium dense to very loose granular silty sands (Marine Deposits) are underlain by successions of very weak to weak sandstone interbedded with very weakly cemented sand, gypsiferous fine-grained sandstone/siltstone, and weak to moderately weak conglomerate/calcisiltite.
The soil/rock conditions were generally loose to medium dense sands overlying weak to very weak sandstone and siltstone with interbeds of gypsiferous and carbonate cemented layers (still relatively weak).
Arabtec Holding, the UAE's biggest construction company, posted a 15 per cent decline in full-year profit.
Arabtec Holding, the UAE's biggest construction company, posted a 15 per cent decline in full-year profit.
Medium dense to very loose granular silty sands (Marine Deposits) are underlain by successions of very weak to weak sandstone interbedded with very weakly cemented sand, gypsiferous fine-grained sandstone/siltstone, and weak to moderately weak conglomerate/calcisiltite.
The soil/rock conditions were generally loose to medium dense sands overlying weak to very weak sandstone and siltstone with interbeds of gypsiferous and carbonate cemented layers (still relatively weak).