Analysis of information sources in references of the Wikipedia article "CE-20" in English language version.
The fifth hot test on the CE20- E13 engine, planned for demonstrating the offnominal operation of the engine (20t-5% Pc & 20t-5% MR and 22t-5%Pc & 22t-5% MR), was successfully conducted for 140s duration on November 8, 2023 at MET facility, IPRC, Mahendragiri. With this test, the CE20 engine is qualified for operating at 22t thrust level in flight
Vacuum ignition test of CE-20 E13 cryogenic engine HT-6 successfully conducted for a duration of 2.5 seconds in High Altitude Test condition at Thrust chamber test facility at IPRC on January 5, 2024.
The fifth hot test on the CE20- E13 engine, planned for demonstrating the offnominal operation of the engine (20t-5% Pc & 20t-5% MR and 22t-5%Pc & 22t-5% MR), was successfully conducted for 140s duration on November 8, 2023 at MET facility, IPRC, Mahendragiri. With this test, the CE20 engine is qualified for operating at 22t thrust level in flight
Vacuum ignition test of CE-20 E13 cryogenic engine HT-6 successfully conducted for a duration of 2.5 seconds in High Altitude Test condition at Thrust chamber test facility at IPRC on January 5, 2024.