Analysis of information sources in references of the Wikipedia article "Cairo Metro" in English language version.
The Ministry of Transportation has increased the price of metro tickets for the second time in less than a year.
The project's scope of work involves the construction of metro line 4 in Cairo, Egypt. The Phase 1 metro line will run from El-Malek El-Saleh Station (Interchange with Line 1) to the October-Oasis Highway Station with a total length of 18 km, passing through Giza Railway Station (Interchange with Line 2). The project also includes the plan to connect the end of Line 4 to the suburbs of 6 October mainly through executing The October 6th Tram system (The O6T) which will be by using a Tram-train system supplied with the Alstom Regio-Citadis trams.
For the rolling stock, the project will require eight train sets, with each featuring 23 cars.
The project's scope of work involves the construction of metro line 4 in Cairo, Egypt. The Phase 1 metro line will run from El-Malek El-Saleh Station (Interchange with Line 1) to the October-Oasis Highway Station with a total length of 18 km, passing through Giza Railway Station (Interchange with Line 2). The project also includes the plan to connect the end of Line 4 to the suburbs of 6 October mainly through executing The October 6th Tram system (The O6T) which will be by using a Tram-train system supplied with the Alstom Regio-Citadis trams.
For the rolling stock, the project will require eight train sets, with each featuring 23 cars.