Analysis of information sources in references of the Wikipedia article "Channel Tunnel" in English language version.
"Four Eurostars broken down at one time – it's absolutely unprecedented", John Keefe of Eurotunnel ... "There's never actually been an evacuation of a Eurostar train in the fifteen years that the tunnel has been opened and last night we evacuated two whole trains to get people off",
This tunnel-boring machine (TBM), built by James Howden at Renfrew, uses the main bearing retrieved from one of the service tunnel-boring machines from the Channel Tunnel. Howden built two of the machines for the main tunnels as well as two machines for the service tunnel in the Channel Tunnel project.
It was at the time the most expensive construction project ever proposed and the final cost was £9 billion.
{{cite web}}
: CS1 maint: archived copy as title (link)shuttle 7340 made a controlled stop in the tunnel at cross-passage 4418
{{cite web}}
: CS1 maint: archived copy as title (link)"Four Eurostars broken down at one time – it's absolutely unprecedented", John Keefe of Eurotunnel ... "There's never actually been an evacuation of a Eurostar train in the fifteen years that the tunnel has been opened and last night we evacuated two whole trains to get people off",
This tunnel-boring machine (TBM), built by James Howden at Renfrew, uses the main bearing retrieved from one of the service tunnel-boring machines from the Channel Tunnel. Howden built two of the machines for the main tunnels as well as two machines for the service tunnel in the Channel Tunnel project.