Hendrickson, C.; B.N. Janson (1984). "A Common Network Flow Formulation for Several Civil Engineering Problems". Civil Engineering Systems. 4. 1 (4): 195–203. Bibcode:1984CEngS...1..195H. doi:10.1080/02630258408970343.
harvard.edu
ui.adsabs.harvard.edu
Hendrickson, C.; B.N. Janson (1984). "A Common Network Flow Formulation for Several Civil Engineering Problems". Civil Engineering Systems. 4. 1 (4): 195–203. Bibcode:1984CEngS...1..195H. doi:10.1080/02630258408970343.
mit.edu
dspace.mit.edu
Blake William Clark Sedore, M.Sc.M.E. dspace.mit.edu "Assembly lead time reduction in a semiconductor capital equipment plant through constraint based scheduling", M. Eng. in Manufacturing thesis, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014.
Santiago, Jesse (February 4, 2009). "Critical Path Method"(PDF). Stanford. Archived from the original(PDF) on October 24, 2018. Retrieved October 24, 2018.
web.archive.org
Santiago, Jesse (February 4, 2009). "Critical Path Method"(PDF). Stanford. Archived from the original(PDF) on October 24, 2018. Retrieved October 24, 2018.