Analysis of information sources in references of the Wikipedia article "Dublin Area Rapid Transit" in English language version.
An Bord Pleanála Statutory Consultation is now closed, as of 28th October 2022
DART+ West [is] The first of the infrastructural projects of the DART+ programme
An initial firm order of 95 vehicles has been placed by the national railway for the Dublin suburban network.
Metrolink and DART + West are included in the plan, but there are no completion dates for the projects
the Dart Underground, previously known as the Interconnector [was] Originally conceived of in the 1972 Transportation in Dublin plan
DART+ West [is] The first of the infrastructural projects of the DART+ programme
Metrolink and DART + West are included in the plan, but there are no completion dates for the projects
An Bord Pleanála Statutory Consultation is now closed, as of 28th October 2022
the Dart Underground, previously known as the Interconnector [was] Originally conceived of in the 1972 Transportation in Dublin plan
An initial firm order of 95 vehicles has been placed by the national railway for the Dublin suburban network.