"East Hamptons schools construction on schedule". The East Hampton Press. August 18, 2009.("Work on the high school, which began in May, is the last phase of the $80 million districtwide expansion and renovation project, which was approved by district voters in a bond referendum in May 2006. The project was scheduled to be finished by the end of 2010")
"School Choice Heats Up". The East Hampton Star. April 30, 2009. [permanent dead link]("East Hampton School District, which has taken on the sole responsibility of educating public high school students on a tuition basis from Sagaponack, Wainscott, Amagansett, Montauk, and Springs for decades.")
"Samuel Meddaugh; Was High School Principal". The East Hampton Star. March 2008. Archived from the original on March 29, 2008.("Samuel Alanson Meddaugh, a former principal at East Hampton High School for whom its auditorium is named ... was the first principal to serve in the new high school building, which opened in 1970")
"Samuel Meddaugh; Was High School Principal". The East Hampton Star. March 2008. Archived from the original on March 29, 2008.("Samuel Alanson Meddaugh, a former principal at East Hampton High School for whom its auditorium is named ... was the first principal to serve in the new high school building, which opened in 1970")