Iterative and incremental development (English Wikipedia)

Analysis of information sources in references of the Wikipedia article "Iterative and incremental development" in English language version.

refsWebsite
Global rank English rank
1st place
1st place
low place
low place
2nd place
2nd place
5th place
5th place
11th place
8th place
low place
9,923rd place
low place
low place
low place
low place
low place
6,873rd place
4,969th place
3,370th place
low place
low place
1,116th place
790th place
low place
low place
2,930th place
2,204th place
388th place
265th place
1,110th place
695th place
1,876th place
1,225th place

arstechnica.com

craiglarman.com

  • Larman, Craig (June 2003). "Iterative and Incremental Development: A Brief History" (PDF). Computer. 36 (6): 47–56. doi:10.1109/MC.2003.1204375. ISSN 0018-9162. S2CID 9240477. We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM's ServiceBureau Corporation]. He was a colleague of John von Neumann, so perhaps he learned it there, or assumed it as totally natural. I do remember Herb Jacobs (primarily, though we all participated) developing a large simulation for Motorola, where the technique used was, as far as I can tell ...'

cyfrania.com

  • Kudryashov, Alexey (February 29, 2024). "Incremental vs Waterfall Model in Software Development". Cyfrania: Custom Software Development & Consulting. Choosing the incremental model for stable-requirement projects can lead to scope creep and increased complexity, while selecting the waterfall model might cause rigidity and inefficiency in adapting to changes.

doi.org

  • Larman, Craig (June 2003). "Iterative and Incremental Development: A Brief History" (PDF). Computer. 36 (6): 47–56. doi:10.1109/MC.2003.1204375. ISSN 0018-9162. S2CID 9240477. We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM's ServiceBureau Corporation]. He was a colleague of John von Neumann, so perhaps he learned it there, or assumed it as totally natural. I do remember Herb Jacobs (primarily, though we all participated) developing a large simulation for Motorola, where the technique used was, as far as I can tell ...'

everydayastronaut.com

everyspec.com

foreignpolicy.com

ieeecomputersociety.org

doi.ieeecomputersociety.org

qz.com

  • Fernholz, Tim (21 October 2014). "What it took for Elon Musk's SpaceX to disrupt Boeing, leapfrog NASA, and become a serious space company". Quartz. Retrieved 11 November 2018. But SpaceX always thought of itself as a tech firm, and its clashes with NASA often took a form computer developers—or anyone familiar with the troubled roll-out of healthcare.gov—would recognize as generational. SpaceX followed an iterative design process, continually improving prototypes in response to testing. Traditional product management calls for a robust plan executed to completion, a recipe for cost overruns.

semanticscholar.org

api.semanticscholar.org

  • Larman, Craig (June 2003). "Iterative and Incremental Development: A Brief History" (PDF). Computer. 36 (6): 47–56. doi:10.1109/MC.2003.1204375. ISSN 0018-9162. S2CID 9240477. We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM's ServiceBureau Corporation]. He was a colleague of John von Neumann, so perhaps he learned it there, or assumed it as totally natural. I do remember Herb Jacobs (primarily, though we all participated) developing a large simulation for Motorola, where the technique used was, as far as I can tell ...'

spaceflightnow.com

spacenews.com

technologyconversations.com

usaid.gov

web.archive.org

whs.mil

esd.whs.mil

  • Kendall, Frank; Gilmore, J. Michael; Halvorsen, Terry (2017-02-02). "Operation of the Defense Acquisition System" (PDF). DoD Issuances. Under Secretary of Defense for Acquisition, Technology, and Logistics. pp. 12–14. Archived from the original (PDF) on 2017-08-09. Retrieved 2017-08-09.

worldcat.org

  • Larman, Craig (June 2003). "Iterative and Incremental Development: A Brief History" (PDF). Computer. 36 (6): 47–56. doi:10.1109/MC.2003.1204375. ISSN 0018-9162. S2CID 9240477. We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM's ServiceBureau Corporation]. He was a colleague of John von Neumann, so perhaps he learned it there, or assumed it as totally natural. I do remember Herb Jacobs (primarily, though we all participated) developing a large simulation for Motorola, where the technique used was, as far as I can tell ...'