"Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
"Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
"a 3 km section of the second line from Hazi Aslanov to Yeni Gunesli (3 stations) was supposed to open in 2015 after construction had started in August 2011."Baku Metro". UrbanRail."