Long Beach International Gateway (English Wikipedia)

Analysis of information sources in references of the Wikipedia article "Long Beach International Gateway" in English language version.

refsWebsite
Global rank English rank
421st place
263rd place
9,380th place
5,183rd place
low place
low place
low place
low place
low place
9,979th place
1st place
1st place
low place
low place
22nd place
19th place
low place
low place
low place
low place
2,030th place
1,178th place

bridgeweb.com

ca.gov

dot.ca.gov

  • Parsons–HNTB Joint Venture (July 2010). Gerald Desmond Bridge Replacement Project: Final Environmental Impact Report / Environmental Assessment & Application Summary Report (PDF) (Report). Port of Long Beach and Caltrans. Retrieved November 21, 2016.
  • Gish, Judy (December 2010). "New Gerald Desmond: a Bridge to California's Economic Future". InsideSeven. Caltrans District 7. Retrieved November 21, 2016.
  • Gish, Judy. "Building Bridges, Raising Economies". InsideSeven. Caltrans District 7. Retrieved October 21, 2016.
  • "Strategic Oversight Agreement for Gerald Desmond Bridge Replacement" (PDF). Caltrans. February 21, 2008. Retrieved November 21, 2016. PROJECT DESCRIPTION
    This project consists of replacement of the aging Gerald Desmond Drive. The project location is in the Back Channel area of the Port of Long Beach, centered along Ocean Blvd. From the intersection of the Terminal Island Freeway (SR-47) at the western end to its terminus at the westerly end of the bridge over the Los Angeles River. The total project cost is estimated to be $721,400,000 subject to escalation from a base November 2005 dollar. Project cost will be revised at environmental certification scheduled for third quarter of 2008. Caltrans fact sheet for project shows construction costs of $800,500,000 with $65,000,000 support costs.

catc.ca.gov

clerk.assembly.ca.gov

leginfo.legislature.ca.gov

enr.com

iheart.com

kfiam640.iheart.com

latimes.com

latimesblogs.latimes.com

lbpost.com

newgdbridge.com

  • "New Bridge at a Glance". New Gerald Desmond Bridge. 2016. Retrieved November 22, 2016. Note 1: WEST APPROACH: The 2,800-ft. west approach will be on Terminal Island.
    Note 7: TOWERS: At 515 feet tall, the bridges two towers will be the second-tallest of any cable-stayed bridge in the U.S. The steel-reinforced concrete towers will be supported by massive foundations. The tower design – unique to this bridge – transitions from an octagon shape at the base to diamond shape at the top.
    Note 8: CABLE-STAYED BRIDGE: The new bridge is a cable-stayed design, in which cables directly connect the towers to the road deck (unlike a traditional suspension bridge, which uses cables draped over towers). The entire length of the bridge – main span and approaches – will be 8,800 feet.
    Note 9: SPAN: The main span and back spans of the bridge will be 2,000 feet long and 205 feet above the water. It will be the highest deck of any cable-stayed bridge in the U.S.
    Note 10: EAST APPROACH: The 3,600-ft. east approach will connect the bridge to both the Long Beach (710) Freeway and east Ocean Boulevard toward downtown Long Beach.
    [permanent dead link]
  • "Caltrans, Port Select Bidders for Bridge Project" (Press release). Port of Long Beach. March 4, 2011. Retrieved December 5, 2016.[permanent dead link]
  • "Caltrans, Port Receive Bridge Replacement Proposals" (Press release). Port of Long Beach. March 2, 2012. Retrieved December 5, 2016.
  • "Commission OKs Desmond Bridge Recommendation" (Press release). Port of Long Beach. May 16, 2012. Retrieved December 5, 2016.
  • "New Bridge Scheduled to Open Oct. 5". The Gerald Desmond Bridge. 2020-09-26. Retrieved 2020-09-28.

pobonline.com

polb.com

presstelegram.com

web.archive.org