Analysis of information sources in references of the Wikipedia article "Malden Center station" in English language version.
At Malden Center Station provisions were made during construction for the installation of an elevator in the future.
Separately, the MBTA hired Fay, Spofford & Thorndike Inc. of Lexington for a maximum of $146,000 to design a wheelchair-access pedestrian overpass at the Malden commuter-rail station. The authority estimates the overpass will cost $2.8 million and set a 1991 completion date.