Kodak Canada was the largest employer in the area before it left the premises, employing about 800 employees in 2005. Total employment within the study area was 3,409 in 2006 - a decrease of 2,816 jobs over the past 11 years.
The Mount Dennis underground stop at Weston Road would serve as the line's western terminus point, said Metrolinx spokesperson Jamie Robinson on Friday, Dec. 7.
A consultant for Metrolinx is confident a historic building on the former Kodak lands will become the main site for a planned light rail transit station for Mount Dennis.
Mount Dennis is a sort of company town originally with Kodak as the major employer. A lot of people have a strong emotional attachment to it," said Simon Chamberlain, a community activist. "With Kodak gone, this is the one bit of legacy that is left. And it's one of the few significant historical buildings in the community.
A 10-kilometre stretch set aside for his surface rail plan along Eglinton West has already been blocked by condo and townhouse development
Some speakers addressed the use of the Kodak lands for the proposed carhouse, and asked that alternative schemes be considered. Part of this relates to a proposed "big box" development on the land. However, Council approved the acquisition of this property, by expropriation if necessary, in December.
Local politicians are quick to agree that such projects should, in theory, create local jobs, especially in hardscrabble areas such as Weston-Mount Dennis.
The figure raises new questions about the viability of doing the entire project for the $8-billion Mr. Tory promised during the mayoral campaign. And it is likely to re-energize debate about whether the area would be better served by a previously proposed light-rail line costing billions of dollars less.
But it wasn't until late last year, when Chamberlain learned the bank would be razed to make way for the Eglinton Crosstown LRT, that he dug a little deeper. As he discovered, the building at the heart of Mount Dennis is in fact deeply embedded in the DNA of the working-class community, with roots tracing back to 1913, when Kodak first set up shop there.
"Tory acts as if SmartTrack is above and beyond what the province is doing, but it's not," said transit expert Steve Munro.
It would have the capacity to run the entire Crosstown system to avoid peak demand times on the provincial power grid and save about 40 per cent on the price of electricity. It would also generate enough power to run the entire Crosstown system in a power outage, said a spokesman for the agency.
It gets snarled in development at the Weston end of the tract, but Tory's campaign says that's not an issue. A tunnel or elevated section of the line would solve the problem — possibly just a trench such as the one the Yonge subway runs in north of Bloor St.
Local politicians are quick to agree that such projects should, in theory, create local jobs, especially in hardscrabble areas such as Weston-Mount Dennis.
Kodak Canada was the largest employer in the area before it left the premises, employing about 800 employees in 2005. Total employment within the study area was 3,409 in 2006 - a decrease of 2,816 jobs over the past 11 years.
The figure raises new questions about the viability of doing the entire project for the $8-billion Mr. Tory promised during the mayoral campaign. And it is likely to re-energize debate about whether the area would be better served by a previously proposed light-rail line costing billions of dollars less.
The Mount Dennis underground stop at Weston Road would serve as the line's western terminus point, said Metrolinx spokesperson Jamie Robinson on Friday, Dec. 7.
A consultant for Metrolinx is confident a historic building on the former Kodak lands will become the main site for a planned light rail transit station for Mount Dennis.
Some speakers addressed the use of the Kodak lands for the proposed carhouse, and asked that alternative schemes be considered. Part of this relates to a proposed "big box" development on the land. However, Council approved the acquisition of this property, by expropriation if necessary, in December.