Open-shop scheduling (English Wikipedia)

Analysis of information sources in references of the Wikipedia article "Open-shop scheduling" in English language version.

refsWebsite
Global rank English rank
2nd place
2nd place
451st place
277th place
207th place
136th place
11th place
8th place
26th place
20th place

ams.org

mathscinet.ams.org

  • Gonzalez, Teofilo; Sahni, Sartaj (1976), "Open shop scheduling to minimize finish time", Journal of the ACM, 23 (4): 665–679, CiteSeerX 10.1.1.394.1507, doi:10.1145/321978.321985, MR 0429089, S2CID 1642775.
  • Williamson, D. P.; Hall, L. A.; Hoogeveen, J. A.; Hurkens, C. A. J.; Lenstra, J. K.; Sevast'janov, S. V.; Shmoys, D. B. (1997), "Short shop schedules", Operations Research, 45 (2): 288–294, doi:10.1287/opre.45.2.288, JSTOR 171745, MR 1644998

doi.org

  • Gonzalez, Teofilo; Sahni, Sartaj (1976), "Open shop scheduling to minimize finish time", Journal of the ACM, 23 (4): 665–679, CiteSeerX 10.1.1.394.1507, doi:10.1145/321978.321985, MR 0429089, S2CID 1642775.
  • Williamson, D. P.; Hall, L. A.; Hoogeveen, J. A.; Hurkens, C. A. J.; Lenstra, J. K.; Sevast'janov, S. V.; Shmoys, D. B. (1997), "Short shop schedules", Operations Research, 45 (2): 288–294, doi:10.1287/opre.45.2.288, JSTOR 171745, MR 1644998

jstor.org

psu.edu

citeseerx.ist.psu.edu

  • Gonzalez, Teofilo; Sahni, Sartaj (1976), "Open shop scheduling to minimize finish time", Journal of the ACM, 23 (4): 665–679, CiteSeerX 10.1.1.394.1507, doi:10.1145/321978.321985, MR 0429089, S2CID 1642775.

semanticscholar.org

api.semanticscholar.org

  • Gonzalez, Teofilo; Sahni, Sartaj (1976), "Open shop scheduling to minimize finish time", Journal of the ACM, 23 (4): 665–679, CiteSeerX 10.1.1.394.1507, doi:10.1145/321978.321985, MR 0429089, S2CID 1642775.