Shell said Tuesday that the 488-metre (1,600 foot) hull of the structure, known as Prelude was floated out of the dry dock in Geoje, South Korea where she is being built.
Shell said Tuesday that the 488-metre (1,600 foot) hull of the structure, known as Prelude was floated out of the dry dock in Geoje, South Korea where she is being built.
Shell approved construction of the world's first floating LNG vessel in 2011 to process gas from the Prelude field, also located off Australia's northern coast. The giant vessel—longer than four soccer fields when laid end to end—is being built in a South Korean shipyard and is scheduled to start producing LNG in 2016. ... Shell has estimated its Prelude project will cost up to $3.5 billion for each million tons of production capacity, indicating a total cost of up to $12.6 billion.