Analysis of information sources in references of the Wikipedia article "SCE-200" in English language version.
{{cite web}}
: CS1 maint: archived copy as title (link)This test demonstrated the complex chill-down operations spanning about 15 hours duration that was conducted successfully, meeting all the required conditions for engine start.After the chill down of the LOX circuit, the feed circuit of kerosene was filled, and LOX was admitted into the gas generator by opening the injection valve. Successful performance of the test article helps derive the sequence of operations for further tests.
{{cite web}}
: CS1 maint: archived copy as title (link)