Analysis of information sources in references of the Wikipedia article "San Joaquins" in English language version.
Regular revenue service begins in both directions between Oakland and Bakersfield on Thursday, March 6.
For the San Joaquins, this will require a new track connection between the BNSF and UPRR mainlines known as the Merced Intermodal Track Connection (MITC) Project (see Figure 4.1). In coordination with CHSRA and the City of Merced, the proposed multi-modal station at Merced would be elevated and have a western boundary at "R" Street. SJJPA is taking the lead in the environmental clearance/detailed design for the MITC Project (CHSRA is environmentally clearing the Merced Multimodal Station). To most efficiently integrate the San Joaquins and the interim HSR services, Merced will become the southern terminus for San Joaquins rail service once operations begin on the HSR infrastructure at the end of 2030.