Analysis of information sources in references of the Wikipedia article "Washington Metro" in English language version.
1975 Cubic wins $54 million contract to provide system for Washington D.C.
extension would have a minimal impact on Metrorail ridership and volumes on study area roadways inside the Beltway and would therefore not relieve congestion in the study corridor.
What do I need to know to build near Metro property? Metro reviews designs and monitors construction of projects adjacent to Metrorail and Metrobus property...
Percentage calculated from figures in pages 12 and 41 . $635.4 mil./$1022.9 mil = 62%.
Replace all 366 of the 2000 and the 3000 Series rail cars with new 8000 Series rail cars.
1975 Cubic wins $54 million contract to provide system for Washington D.C.
{{cite web}}
: CS1 maint: numeric names: authors list (link)extension would have a minimal impact on Metrorail ridership and volumes on study area roadways inside the Beltway and would therefore not relieve congestion in the study corridor.
{{cite web}}
: CS1 maint: numeric names: authors list (link)What do I need to know to build near Metro property? Metro reviews designs and monitors construction of projects adjacent to Metrorail and Metrobus property...
Percentage calculated from figures in pages 12 and 41 . $635.4 mil./$1022.9 mil = 62%.
Replace all 366 of the 2000 and the 3000 Series rail cars with new 8000 Series rail cars.