Report on the SL-1 Incident, January 3, 1961, The General Manager's Board of Investigation, For Release in Newspapers dated Sunday, Curtis A. Nelson, Clifford Beck, Peter Morris, Donald Walker, Forrest Western, June 11, 1961.
IDO-19313: Additional Analysis of the SL-1 ExcursionArchived 2011-09-27 at the Wayback Machine. Final Report of Progress July through October 1962, November 21, 1962, Flight Propulsion Laboratory Department, General Electric Company, Idaho Falls, Idaho, U.S. Atomic Energy Commission, Division of Technical Information.
Grant, N. R.; Hamer, E. E.; Hooker, H. H.; Jorgensen, G. L.; Kann, W. J.; Lipinski, W. C.; Milak, G. C.; Rossin, A. D.; Shaftman, D. H.; Smaardyk, A.; Treshow, M. (May 1961). Design of the Argonne Low Power Reactor (ALPR) (Technical report). Argonne National Laboratory. doi:10.2172/4014868. OSTI4014868。
Record of DecisionArchived 2011-07-18 at the Wayback Machine., Stationary Low-Power Reactor-1 and Boiling Water Reactor Experiment-I Burial Grounds (Operable Units 5-05 and 6-01), and 10 No Action Sites (Operable Units 5-01, 5-03, 5-04, and 5-11), January 1996.
Grant, N. R.; Hamer, E. E.; Hooker, H. H.; Jorgensen, G. L.; Kann, W. J.; Lipinski, W. C.; Milak, G. C.; Rossin, A. D.; Shaftman, D. H.; Smaardyk, A.; Treshow, M. (May 1961). Design of the Argonne Low Power Reactor (ALPR) (Technical report). Argonne National Laboratory. doi:10.2172/4014868. OSTI4014868。
Grant, N. R.; Hamer, E. E.; Hooker, H. H.; Jorgensen, G. L.; Kann, W. J.; Lipinski, W. C.; Milak, G. C.; Rossin, A. D.; Shaftman, D. H.; Smaardyk, A.; Treshow, M. (May 1961). Design of the Argonne Low Power Reactor (ALPR) (Technical report). Argonne National Laboratory. doi:10.2172/4014868. OSTI4014868。
IDO-19313: Additional Analysis of the SL-1 ExcursionArchived 2011-09-27 at the Wayback Machine. Final Report of Progress July through October 1962, November 21, 1962, Flight Propulsion Laboratory Department, General Electric Company, Idaho Falls, Idaho, U.S. Atomic Energy Commission, Division of Technical Information.
Record of DecisionArchived 2011-07-18 at the Wayback Machine., Stationary Low-Power Reactor-1 and Boiling Water Reactor Experiment-I Burial Grounds (Operable Units 5-05 and 6-01), and 10 No Action Sites (Operable Units 5-01, 5-03, 5-04, and 5-11), January 1996.