“FSO SAFER: Call for equipment for oil spill response preparedness”. IMO (2023年4月24日). 2023年10月28日閲覧。 “On 9 March, the UN Development Programme (UNDP) signed an agreement to purchase a very large crude carrier (VLCC), the Nautica, to take on the oil from the FSO SAFER by emergency ship-to-ship transfer.”
“7. What is the plan for the FSO SAFER? FSO SAFER: Ship-to-ship transfer of oil completed”. IMO. 2023年10月28日閲覧。 “Following the emergency operation to transfer the oil to a safe temporary vessel, a catenary anchor leg mooring (CALM) buoy will be installed to which the replacement vessel will be tethered, and the removal of the FSO Safer for safe recycling will take place (read more here).”