Analysis of information sources in references of the Wikipedia article "Washington Metrosu" in Turkish language version.
1975 Cubic wins $54 million contract to provide system for Washington DC
extension would have a minimal impact on Metrorail ridership and volumes on study area roadways inside the Beltway and would therefore not relieve congestion in the study corridor.
1975 Cubic wins $54 million contract to provide system for Washington DC
Starting 7:00am Sunday, March 6, 2016, a SmarTrip® card is required to ride Metrorail. Metro has completed its efforts to eliminate paper farecards
extension would have a minimal impact on Metrorail ridership and volumes on study area roadways inside the Beltway and would therefore not relieve congestion in the study corridor.
Starting 7:00am Sunday, March 6, 2016, a SmarTrip® card is required to ride Metrorail. Metro has completed its efforts to eliminate paper farecards