Đập Cẩm Bình-II (Vietnamese Wikipedia)

Analysis of information sources in references of the Wikipedia article "Đập Cẩm Bình-II" in Vietnamese language version.

refsWebsite
Global rank Vietnamese rank
low place
low place
2nd place
2nd place

chincold.org.cn

  • Shiyong, Wu; Manbin, Shen; Jian, Wang (tháng 8 năm 2010). "Jinping hydropower project: main technical issues on engineering geology and rock mechanics" (PDF). Bulletin of Engineering Geology and the Environment. Quyển 69 số 3. tr. 325–332. doi:10.1007/s10064-010-0272-4. Water is directed through the mountains in four 16.7 km long, c. 13 m diameter tunnels, beneath up to 2,525 m of overburden, to the Jinping II underground powerhouse where the head is 310 m.

doi.org

  • Shiyong, Wu; Manbin, Shen; Jian, Wang (tháng 8 năm 2010). "Jinping hydropower project: main technical issues on engineering geology and rock mechanics" (PDF). Bulletin of Engineering Geology and the Environment. Quyển 69 số 3. tr. 325–332. doi:10.1007/s10064-010-0272-4. Water is directed through the mountains in four 16.7 km long, c. 13 m diameter tunnels, beneath up to 2,525 m of overburden, to the Jinping II underground powerhouse where the head is 310 m.