上層記憶區 (Chinese Wikipedia)

Analysis of information sources in references of the Wikipedia article "上層記憶區" in Chinese language version.

refsWebsite
Global rank Chinese rank
low place
low place
1st place
1st place

web.archive.org

  • Dryfoos, Mike (编). MS-DOS 5.0 Development Post-Mortem Report (PDF) (mail as court document). Microsoft: 10. 1991-09-18 [1991-07-19] [2019-07-22]. MS-PCA1179169 (MS-PCA1179159-MS-PCA1179191). MS7020988 (MS7020978-MS7021010). Depo. Ex. 1109. Comes v Microsoft Plaintiff's Exhibit 3473. CA.No.2:96CV645B Plaintiff's Exhibit 477. (原始内容存档 (PDF)于2019-04-02). […] One of the most important stimulanta for adding features was competitive pressure from DRDOS 5.0, which we first learnt of in the spring of 1990. The DRDOS feature set led us to add UMB support, task swapping, and Undelete. […] Considerable amounts of the team's management attention was diverted to new features such as file transfer software, undelete and network installation […] Eventually this situation reached a crisis point at the end of July 1990, and, led by BradS, the team's management spent an arduous series of meetings nailing down a schedule and process for closing the project down […]  (1+32 pages)

windowswiki.info

  • Dryfoos, Mike (编). MS-DOS 5.0 Development Post-Mortem Report (PDF) (mail as court document). Microsoft: 10. 1991-09-18 [1991-07-19] [2019-07-22]. MS-PCA1179169 (MS-PCA1179159-MS-PCA1179191). MS7020988 (MS7020978-MS7021010). Depo. Ex. 1109. Comes v Microsoft Plaintiff's Exhibit 3473. CA.No.2:96CV645B Plaintiff's Exhibit 477. (原始内容存档 (PDF)于2019-04-02). […] One of the most important stimulanta for adding features was competitive pressure from DRDOS 5.0, which we first learnt of in the spring of 1990. The DRDOS feature set led us to add UMB support, task swapping, and Undelete. […] Considerable amounts of the team's management attention was diverted to new features such as file transfer software, undelete and network installation […] Eventually this situation reached a crisis point at the end of July 1990, and, led by BradS, the team's management spent an arduous series of meetings nailing down a schedule and process for closing the project down […]  (1+32 pages)