Analysis of information sources in references of the Wikipedia article "Metropolitenlar roʻyxati" in Uzbek language version.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2019
As for the station opened after the end of 2019, see „Estação Estrada Parque começa a funcionar na segunda-feira“ (pt-BR). Correio Braziliense. Diários Associados (3-yanvar 2020-yil). Qaraldi: 2020-yil 1-mart.
As for the latest extension, see „La Comunidad abre la estación de metro Arroyofresno al público tras 20 años“ (Spanish). La Vanguardia. Grupo Godó (21-mart 2019-yil). Qaraldi: 2020-yil 25-aprel.
{{cite thesis}}
: CS1 maint: date format ()As for the section opened after the end of 2019, see Roy, Subhajoy. „First phase of East-West Metro unveiled“. The Telegraph. Ananda Bazar Patrika (ABP) Group (14-fevral 2020-yil). Qaraldi: 2020-yil 15-fevral.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2018
As for the Suin Line, which was extended after the end of 2013, see Burroughs, David (15 September 2020). „Final phase of Korea's Suin Line complete“. International Railway Journal. Simmons-Boardman Publishing Inc. Qaraldi: 2020-09-17.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2019
As for the latest extension, see „La Comunidad abre la estación de metro Arroyofresno al público tras 20 años“ (Spanish). La Vanguardia. Grupo Godó (21-mart 2019-yil). Qaraldi: 2020-yil 25-aprel.
This ridership figure includes the ViaQuatro Line 4 and Via Mobilidade Line 5 ridership in the total.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2019
This ridership figure is the sum of those quoted for the rapid transit lines
Annual ridership figure is calculated from the 378229 passenger daily average quoted for metro lines ( 2Andoza:Nihongo2) only.
As for the Suin Line, which was extended after the end of 2013, see Burroughs, David (15 September 2020). „Final phase of Korea's Suin Line complete“. International Railway Journal. Simmons-Boardman Publishing Inc. Qaraldi: 2020-09-17.
{{cite magazine}}
: CS1 maint: date format (){{cite magazine}}
: CS1 maint: date format ()Annual ridership figure calculated from the 3.384 million passenger daily average quoted.
As for the section opened after the end of 2019, see Roy, Subhajoy. „First phase of East-West Metro unveiled“. The Telegraph. Ananda Bazar Patrika (ABP) Group (14-fevral 2020-yil). Qaraldi: 2020-yil 15-fevral.
As for the latest extension, see „L'estació de Zona Franca de la línia 10 Sud de metro obrirà les portes dissabte a les 3 de la tarda“. Transports Metropolitans de Barcelona (TMB) (30-yanvar 2020-yil). Qaraldi: 2020-yil 6-aprel.
As for the latest extension, see „L'estació de Zona Franca de la línia 10 Sud de metro obrirà les portes dissabte a les 3 de la tarda“. Transports Metropolitans de Barcelona (TMB) (30-yanvar 2020-yil). Qaraldi: 2020-yil 6-aprel.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2019
As for the latest extension, see „La Comunidad abre la estación de metro Arroyofresno al público tras 20 años“ (Spanish). La Vanguardia. Grupo Godó (21-mart 2019-yil). Qaraldi: 2020-yil 25-aprel.
This ridership figure includes the ViaQuatro Line 4 and Via Mobilidade Line 5 ridership in the total.
This ridership figure is derived from the sum of the twelve monthly subtotals for 2019
Annual ridership figure is calculated from the 378229 passenger daily average quoted for metro lines ( 2Andoza:Nihongo2) only.